I.
Project
Requiredsqft
II.
Land & Site
Required$
Dirt only — does not include site prep or hookups
$
Title, transfer tax, survey
$
Clearing, grading, demo
$
Water, sewer, electric, gas taps
$
Jurisdictional — varies enormously
III.
Hard Costs
Requiredsqft
Heated/cooled space
$
Framing + MEP + finishes, regional
sqft
Set 0 if no garage
$
Typically 30–40% of living $/sqft
$
$
Pool, deck, outdoor kitchen — optional
IV.
Soft Costs
Required%
% of hard costs
$
Building permit + inspection fees
$
Lump sum for the build period
$
Total over the build period
$
$
Surveys, legal, marketing
V.
Construction Financing
Required%
%
%
% of loan, paid at closing
$
Underwriting, draws, inspections
Milestone% of loanMonth
Foundation
%
Framing
%
Dry-in (roof + windows)
%
MEP rough-in
%
Drywall + finishes
%
Final / CO
%
Estimated interest carry — mo
—
Computed automatically from the loan amount, rate, and selected carry model. Updates as you change inputs.
VI.
Timeline
Requiredmo
Design + permits
mo
Ground-break to certificate of occupancy
mo
After CO until exit
VII.
Contingency
Required%
% of hard costs
mo
Extra months added to carry calc
VIII.
Build-to-Sell Exit
Required$
Finished comparable sale price
%
Commission + closing + concessions
days
Informs lease-up months in carry
%
Dealer treatment: ordinary income + SE tax + state. Typical 30–45%.
IX.
Build-to-Rent Exit
Optional$
%
%
%
Lower for new construction
%
Lower — everything's new
$
%
%
%
%
%
Operating Costs (shared)
$
$
$
$0 if tenant pays
$
Permanent (take-out) loan
%
%
yrs
%
% of new loan
X.
Long-Term Outlook
Optional%
%
%
yrs
%
Drives the development spread
%